| 1 | 2 | Determination Of Schedule Of Outstanding Committee Items | Informational Report | Determination Of Schedule Of Outstanding Committee Items | Received and Filed | Pass |
Action details
|
Not available
|
14-0352
| 1 | 3 | Replacement Of Embarcadero Bridge Over Lake Merritt Channel | City Resolution | Subject: Replacement Of Embarcadero Bridge Over Lake Merritt Channel
From: Public Works Department
Recommendation: Adopt The Following Pieces Of Legislation:
1) A Resolution Authorizing The City Administrator, Or Designee, To Accept And Appropriate Up To Nineteen Million Eight Hundred Eighty-Three Thousand Four Hundred Sixty-Seven Dollars ($19,883,467.00) In Federal Highway Administration And State Proposition 1B Funds For The Replacement Of Embarcadero Bridge Over Lake Merritt Channel (Project No. G121810); And | Approved the Recommendation of Staff, and Forward | |
Action details
|
Not available
|
14-0353
| 1 | | | City Resolution | 2) A Resolution Awarding A Construction Contract To Flatiron West, Inc., The Lowest Responsive, Responsible Bidder, In Accordance With Plans And Specifications For The Replacement Of Embarcadero Bridge Over Lake Merritt Channel (Project No. G121810) And With Contractor's Bid In The Amount Of Sixteen Million Three Hundred Ninety-Nine Thousand Five Hundred Twenty-Seven Dollars And Ten Cents ($16,399,527.10); And | Approved the Recommendation of Staff, and Forward | Pass |
Action details
|
Not available
|
14-0354
| 1 | | | City Resolution | 3) A Resolution Authorizing The City Administrator, Or Designee, To Waive The RFP/RFQ Competitive Selection Process Requirements And Authorizing An Amendment To The Professional Services Contract With T.Y. Lin International/AECOM, Joint Venture For The Replacement Of Embarcadero Bridge Over Lake Merritt Channel (Project No. G121810) Increasing The Scope Of Work And The Contract Amount By Five Hundred Thousand Dollars ($500,000.00) For A Total Contract Amount Not To Exceed Two Million Four Hundred Eighty Thousand Two Hundred Forty-Four Dollars ($2,480,244.00); And | Approved the Recommendation of Staff, and Forward | Pass |
Action details
|
Not available
|
14-0355
| 1 | | | City Resolution | 4) A Resolution Awarding A Professional Services Contract To Biggs Cardosa Associates, Inc. To Provide Special Inspection And Material Testing Services For The Replacement Of Embarcadero Bridge Over Lake Merritt Channel (Project No. G121810) In An Amount Not To Exceed Five Hundred Thousand Dollars ($500,000.00) | Approved the Recommendation of Staff, and Forward | Pass |
Action details
|
Not available
|
14-0356
| 1 | 4 | Partial Abandonment Of Thomas Berkley Way | City Resolution | Subject: Partial Abandonment Of Thomas Berkley Way
From: Public Works Department
Recommendation: Conduct A Public Hearing And Upon Conclusion Adopt The Following Pieces Of Legislation:
1) A Resolution Of Findings Supporting The Vacation To The City Of Oakland Of A Portion Of The Public Right-Of-Way Of Thomas Berkley Way (Formerly Known As 20th Street) From Its Intersection At Harrison Street To Its Intersection With Lakeside Drive; And | Approved the Recommendation of Staff, and Forward | Pass |
Action details
|
Not available
|
14-0357
| 1 | | Partial Abandonment Of Thomas Berkley Way | Ordinance | Subject: Partial Abandonment Of Thomas Berkley Way
From: Oakland Public Works Department
Recommendation: Adopt An Ordinance Vacating To The City Of Oakland A Portion Of The Public Right-Of-Way Of Thomas Berkley Way (Formerly Known As 20th Street) From Its Intersection At Harrison Street To Its Intersection With Lakeside Drive | Approved the Recommendation of Staff, and Forward | Pass |